FACILITIES/BOND


HAMILTON ELEMENTARY SCHOOL (One Main Gate Road)

  • Install fire hydrants
  • Improve access for fire and emergency vehicles
  • Repair and replace school building roofs
  • Repair dry rot, termite damage, other needed structural repairs to school building
  • Remove hazardous materials, including asbestos, lead-based paint, and other hazardous materials
  • Americans with Disability Act (“ADA”) improvements, including ramps, pathways, restrooms, etc., as required by the State of California
  • Upgrade electrical systems, including panels, circuit breakers, transformers, wiring and outlets
  • Repair and paint exterior walls, replace exterior siding, if needed
  • Upgrade heating and ventilation systems
  • Improvements to classroom interiors, including: patch, paint and refinish (or replace, as necessary) walls and wall coverings, floors and floor coverings, ceilings, cabinets, drapes and blinds, install marker boards and tackable surfaces
  • Upgrade exterior lighting for safety and security
  • Repair and renovate school grounds and fields for safety

COMPLETED PROJECTS

  YEAR 2001  
#601 Upgrade Signal System $276,468
     
  YEAR 2002  
#617 Kindergarten Playground Paving $21,303
#608 Re-Roofing
HVAC Replacement - Hamilton (heating & a/c)
$803,494
     
  YEAR 2003  
#635 HVAC Replacement - Meadow Park (heating)
Underground gas line replacement
Asbestos Abatement as needed
$179,001
     
  YEAR 2004  
#670

Upgrade/ Improve Exeterior Lighting
Upgrade electrical distribution system

$796,649
     
  YEAR 2005  
#700 Classroom Modernization Bldg C & D
Restroom Renovation
Asbestos Abatement as needed
ADA - site Accessibility
Repair & repaint exterior finishes
Lead Abatement as needed
Structural Repairs (pest/water damage)
$2,152,522
     
  YEAR 2006  
#720 Classroom/Library Modernization Bldg A,B,E
Restroom Renovation
Asbestos Abatement as needed
ADA - Site Accessibility
$1,336,205
     
CURRENT PROJECTS
 
     
  YEAR 2007  
#742 Meadow Park Classroom
Classroom Modernization bldg F, J
Restroom Renovation
ADA - Site Accessibility
**$1,787,305
 
** Projected Cost

FUTURE PROJECTS

 
     
  YEAR 2008  
#740 Fire Access Hydrants ** $815,528
#741 Athletic Field Renovation (Replace Irrigation)
Paving - Pathways & Parking Areas
** $239,621
 

Meadow Park Offices

** $529,387
    ** Projected Cost
     
TOTAL BUDGET ALLOCATION FOR SITE $8,937484

LOMA VERDE ELEMENTARY SCHOOL (399 Alameda de la Loma)

  • Repair and replace school building roofs
  • Remove hazardous materials, including asbestos, lead-based paint, and other hazardous materials
  • Americans with Disability Act (“ADA”) improvements, including ramps, pathways, restrooms, etc., as required by the State of California
  • Upgrade electrical systems, including panels, circuit breakers, transformers, wiring and outlets
  • Repair and paint exterior walls, replace exterior siding, if needed
  • Upgrade heating and ventilation systems
  • Improvements to classroom interiors, including: patch, paint and refinish (or replace, as necessary) walls and wall coverings, floors and floor coverings, ceilings, cabinets, drapes and blinds, install marker boards and tackable surfaces
  • Upgrade exterior lighting for safety and security
  • Repair and renovate school grounds and fields for safety

COMPLETED PROJECTS

  YEAR 2002  
#615 Paving - Parking Area $68,852
#610 Roof Replacement / Replace skylight $397,314
#628 ADA Ramp $46,493
     
  YEAR 2003  
#636 Repair & repaint exterior finishes
Lead Abatement as needed
HVAC Replacement (heating)
Asbestos Abatement as needed
Upgrade / Improve Exterior Lighting
Upgrade Singal System
$770,915
     
  YEAR 2004  
#701 School Modernization Phase I
Classroom/Library Modernization Bldg B,C,G
Restroom Renovation
Asbestos Abatement as needed
ADA - site Accessibility
Upgrade electrical distribution system
$1,041,096
     
  YEAR 2005  
#745 School Modernization Phase II
Classroom Modernization Bldg D & E
Restroom Renovation
Asbestos Abatement as needed
$1,413,124
     
  YEAR 2006  
  None  
     
CURRENT PROJECTS
 
  YEAR 2007  
#744 Athletic Field Renovation (Replace irrigation) **$212,220
    ** Projected Cost
     
TOTAL BUDGET ALLOCATION FOR SITE $3,950,015

 

 

 

 

 

 

 


LU SUTTON ELEMENTARY SCHOOL (1800 Center Road)

  • Install fire hydrants
  • Improve access for fire and emergency vehicles
  • Remove hazardous materials, including asbestos, lead-based paint, and other hazardous materials
  • Americans with Disability Act (“ADA”) improvements, including ramps, pathways, restrooms, etc., as required by the State of California
  • Repair and paint exterior walls, replace exterior siding, if needed
  • Upgrade heating and ventilation systems
  • Improvements to classroom interiors, including: patch, paint and refinish (or replace, as necessary) walls and wall coverings, floors and floor coverings, ceilings, cabinets, drapes and blinds install marker boards and tackable surfaces
  • Upgrade exterior lighting for safety and security
  • Repair and renovate school grounds and fields for safety

COMPLETED PROJECTS

  YEAR 2002  
  None  
     
  YEAR 2003  
#672 Fire Hydrant
Emergency Access Improvements & Paving
$132,494
     
  YEAR 2004  
#673 Upgrade/Improve Lighting $46,767
#702 Reapir & repair exterior finishes
Lead abatement as needed
Structural Repairs (pest/water damage)
$180,395
     
  YEAR 2005  
#746

Classroom Modernization bldg D, E, & F
Restroom Renovations
Asbestos Abatement as needed
Upgrade HVAC Bldgs D, E & F

$1,352,896
     
CURRENT PROJECTS
 
  YEAR 2007  
#674 Athletic Field Renovation (replace irrigation) Phase 1 ** $243,300
     
FUTURE PROJECTS
 
  YEAR 2007  
  Athletic Field Renoation Phase 2 ** $60,000
    ** Projected Cost
     
TOTAL BUDGET ALLOCATION FOR SITE $3,491,352

LYNWOOD ELEMENTARY SCHOOL (1320 Lynwood Drive)

  • Install fire hydrants
  • Improve access for fire and emergency vehicles
  • Repair and replace school building roofs
  • Remove hazardous materials, including asbestos, lead-based paint, and other hazardous materials
  • Americans with Disability Act (“ADA”) improvements, including ramps, pathways, restrooms, etc., as required by the State of California
  • Upgrade electrical systems, including panels, circuit breakers, transformers, wiring and outlets
  • Repair and paint exterior walls, replace exterior siding, if needed
  • Upgrade heating and ventilation systems
  • Improvements to classroom interiors, including: patch, paint and refinish (or replace, as necessary) walls and wall coverings, floors and floor coverings, ceilings, cabinets, drapes and blinds install marker boards and tackable surfaces
  • Upgrade exterior lighting for safety and security
  • Repair and renovate school grounds and fields for safety

COMPLETED PROJECTS
  YEAR 2002  
#606 Replace Skylight
Reroofing
$468,392
#623 Fire Access Hydrants Phase 1
Paving - Pathways & Parking Arease Phase 1
$214,193
#629 Paving - Pathways & Parking Areas Phase 2 $20,246
     
  YEAR 2003  
#633 Signal System Replacement $50,613
#638 Paving - Phase 3 - Kindergarten
Reapir & repair exterior finishes
Lead Abatement as needed
Structural Repairs (pest/water damage)
Restroom Renovation Bldg B & C
Upgrade HVAC (Heating & A/C Campuswide)
Upgrade/Improe Exterior Lighting
Upgrade electrical distribution system
$958,081
     
  YEAR 2004  
#704 Classroom/Library Modernization Bldg A & D
ADA - Site Accessibility
Restroom Renovation
Asbestos Abatement as Needed
$689,328
#657 Hydrants Phase II/Paving btwn Buildings $116,428
     
  YEAR 2004  
#722 Classroom Modernization bldg B & C
Asbestos Abatement as needed
$762,053
     
FUTURE PROJECTS
 
  YEAR 2008  
  Athletic Field Renovation (replace irrigation) $200,000
    ** Projected Cost
     
TOTAL BUDGET ALLOCATION FOR SITE $3,479,334

OLIVE ELEMENTARY SCHOOL (629 Plum Street)

  • Upgrade fire alarm systems, install fire hydrants
  • Improve access for fire and emergency vehicles
  • Repair and replace school building roofs
  • Remove hazardous materials, including asbestos, lead-based paint, and other hazardous materials
  • Americans with Disability Act (“ADA”) improvements, including ramps, pathways, restrooms, etc., as required by the State of California
  • Upgrade electrical systems, including panels, circuit breakers, transformers, wiring and outlets
  • Repair and paint exterior walls, replace exterior siding, if needed
  • Upgrade heating and ventilation systems
  • Improvements to classroom interiors, including:
    patch, paint and refinish (or replace, as necessary) walls and wall coverings, floors and floor coverings, ceilings, cabinets, drapes and blinds install marker boards and tackable surfaces
  • Upgrade exterior lighting for safety and security
  • Repair and renovate school grounds and fields for safety

COMPLETED PROJECTS

  YEAR 2002  
#605 ReRoofing $180,279
     
  YEAR 2003  
#604 Fire Alarm & Signal System Replacement $132,998
#640

Restroom Renovation bldgs A,B & D
Reapir & repaint exterior finishes
Lead Abatement as needed
Structural Reapirs (pest/water damage)
Upgrade/Improve Exterior Lighting
Upgrade electrical distribution system

$659,604
     
  YEAR 2004  
#706 Fire Access Hydrants
Paving - Pathways & Parking Areas
ADA - Site Accessibility
$520,857
     
  YEAR 2005  
#705 Classrm/Library Moderniz Bldg A,D & F
Upgrade HVAC
Asbestos Abatement as Needed
$1,159,308
#723 Design Fees for Porject 705 (2001) $97,000
     
  YEAR 2006  
#747 Classroom Modernization Bldg B & C
Upgrade HVAC
Restroom Renoation
Asbestos Abatement as needed
$1,168,700
     
FUTURE PROJECTS
 
  YEAR 2008  
#766 Athletic Field Renovation **$100,000
    ** Projected Cost
     
TOTAL BUDGET ALLOCATION FOR SITE $4,018,745

PLEASANT VALLEY ELEMENTARY (755 Sutro Avenue)

  • Upgrade fire alarm systems, install fire hydrants
  • Improve access for fire and emergency vehicles
  • Repair and replace school building roofs
  • Remove hazardous materials, including asbestos, lead-based paint, and other hazardous materials
  • Americans with Disability Act (“ADA”) improvements, including ramps, pathways, restrooms, etc., as required by the State of California
  • Upgrade electrical systems, including panels, circuit breakers, transformers, wiring and outlets
  • Repair and paint exterior walls, replace exterior siding, if needed
  • Upgrade heating and ventilation systems

COMPLETED PROJECTS

  YEAR 2002  
#609 ReRoofing
Replace Gas Line

$850,950

   

 

  YEAR 2003

 

#630 Fire Alarm & Signal System Replacement

$131,610

#641

Upgrade/Improve Exterior Lighting
Upgrae electrical distribution system

$76,495

#676 Fire Hydrant Access
Paving - Pathways & Parking Areas

$193,629

   

 

  YEAR 2004  
#767 Repair & repaint exterior finishes
Lead Abatement as needed
Structural Repairs (pest/water damage)
$151,908
     
  YEAR 2006

 

#748 Classroom Modernization Bldg K & B
Restroom Renovation
Asbestos Abatement as needed
ADA - Site Accessibility

$1,285,700

   

 

     
CURRENT PROJECTS
 
  YEAR 2006  
#785 Classroom Modernization bldg A, C, D, & E
Restroom Renovation
Asbestos Abatement as needed
ADA - Site Accessibility
**$1,877,720
    ** Projected Cost
     
TOTAL BUDGET ALLOCATION FOR SITE $4,771,615
     

RANCHO ELEMENTARY SCHOOL (1430 Johnson Street)

  • Upgrade fire alarm systems, install fire hydrants
  • Improve access for fire and emergency vehicles
  • Repair and replace school building roofs
  • Remove hazardous materials, including asbestos, lead-based paint, and other hazardous materials
  • Americans with Disability Act (“ADA”) improvements, including ramps, pathways, restrooms, etc., as required by the State of California
  • Upgrade electrical systems, including panels, circuit breakers, transformers, wiring and outlets
  • Repair and paint exterior walls, replace exterior siding, if needed
  • Upgrade heating and ventilation systems
  • Improvements to classroom interiors, including: patch, paint and refinish (or replace, as necessary) walls and wall coverings, floors and floor coverings, ceilings, cabinets, drapes and blinds, install marker boards and tackable surfaces
  • Upgrade exterior lighting for safety and security
  • Repair and renovate school grounds and fields for safety

COMPLETED PROJECTS

  YEAR 2002  

#607

Replace Gas Line
Reroofing
$464,573
     
  YEAR 2003  
#631 Upgrade fire Alarm & Signal System $136,022
#642 Upgrade/Improve Exterior Lighting
Upgrade electrical distribution system
Upgrade HVAC (Heating & A/C Campuswide
$384,434
#677 Fire Access Hydrants
Paving - Pathways & Parking Areas &SRES
$130,249
     
  YEAR 2004  
#678 Athletic field Renovation $36,249
#707 School Modernization Phase 1
classroom Modernization Bldg B,C & H
Restroom Renoation
Asbestos Abatement as needed
ADA - Site Accessibility
$1,087,818
     
  YEAR 2005  
#725 School Modernization Phase 2
Classroom Modernization bldg D & E
Restroom Renovation
Astestos Abatement as needed
$1,124,679
     
  YEAR 2006  
#749 Repair & repaint exterior finishes
Lead Abatement as needed
Structural Repairs (pest/water damage)
$182,000
     
TOTAL BUDGET ALLOCATION FOR SITE $3,546,024

SAN RAMON ELEMENTARY SCHOOL (45 San Ramon Way)

  • Repair and replace school building roofs
  • Americans with Disability Act (“ADA”) improvements, including ramps, pathways, restrooms, etc., as required by the State of California
  • Upgrade electrical systems, including panels, circuit breakers, transformers, wiring and outlets
  • Repair and paint exterior walls, replace exterior siding, if needed
  • Upgrade school phone and intercom systems
  • Upgrade heating and ventilation systems
  • Improvements to classroom interiors, including: patch, paint and refinish (or replace, as necessary) walls and wall coverings, floors and floor coverings, ceilings, cabinets, drapes and blinds, install marker boards and tackable surfaces
  • Upgrade exterior lighting for safety and security
  • Repair and renovate school grounds and fields for safety

COMPLETED PROJECTS

  YEAR 2002  
#616 Paving - Parking areas $55,478
#618 Paving - Pathways& Playground Slurry Seal $34,248
     
  YEAR 2003  
#632 Upgrade Signal System $117,948
#643 Upgrade/Improve Exterior Lighting $36,229
     
  YEAR 2005  
#798 Athletic Field Renovation $50,371
     
  YEAR 2006  
#726 Classroom Modernization Bldg A thru D & E
Restroom Renovation
Upgrade electrical distribution system
ADA- Site Accessibiity
$5,491,200
     

CURRENT PROJECTS

 
  YEAR 2007  
#750 Repair & repaint exterior finishes
Lead Abatement as needed
Structural Repairs (pest/water damage)
** $86,953
#751 Reroofing
Upgrade HVAC (Heating & A/C campuswide)
** $910,000
     

FUTURE PROJECTS

 
  YEAR 2008  
#752 Paving - Play areas ** $223,256